June 10, 2010
The contractor has applied the asphalt emulsion to make the road
tacky in preparation for paving. Please drive
carefully and slowly in order to decrease splattering of asphalt.
The Village does not pay for the removal of this
material if it gets on your car. Please avoid walking in the street,
and instruct your children to avoid the pavement as
this material can get onto shoes. Also, if you have a lawn sprinkler,
please turn it off or make sure that it does not
put water onto the pavement, as this will increase the likelihood
that the material will not dry properly.
Shortly following the tack oil, the contractor
will install the leveling binder, which is a thin layer of a bituminous
pavement, to be followed by final paving. Lastly, the contractor
will address final punch-list items as well as
complete all required restoration. If you believe a facet of the
project has been missed, please contact us so we can
investigate the issue and notify the contractor, before they
complete their work.
As you may have already noticed, the contractor
is completing the driveway repairs and will have the leveling
course completed by the end of the week. After the weekend,
the contractor will begin prepping for the surface
course and doing general project restoration. The contractor
hasn't established the exact date for the surface course,
but once he has completed the drives and restorations, he expects
to begin the surface paving operation next week.
The Village Staff and the contractor will travel
the project and prepare a punch list of items yet to be completed
such as general clean-up, restorations, and minor odds and
ends that seem to come up on large projects such as this.
These issues should all be completely resolved prior to the
project completion date. Please note that when the
restoration work is completed, it will need to be watered
by the individually affected residents.
The project is on schedule for completion by June 25, 2010,
weather permitting.
During this project, there will be large equipment
and trucks traveling on these streets. Please talk to your
children
about the dangers of playing near excavations, equipment,
and material stockpiles. With your patience and
cooperation, the project will proceed smoothly.
We will try to keep you updated as work progresses.
If you have any questions, please contact the Engineering
Division
of Public Works at 847.883.8600 between 8:30 a.m.
and 4:00 p.m., Monday through Friday. For problems
that
develop
after hours, you may call the Police non-emergency
number at 847.883.9900 and they will contact the
proper personnel
for follow-up. Thank you for your cooperation.
|